elen

Activity 7.3

Reporting to the EC

Activity 7.3 aims to ensure that regular reporting of the technical and financial progress of the project to the EC takes place. One (1) inception report, one (1) mid-term report, one (1) progress report and one (1) final report shall be prepared.

You can download:

The Inception Report of the Project here (limited access).

The Midterm Report of the Project here (limited access).