ACTION 3

Development of the Integrated Solid Waste Management system in the Municipality of Tinos/ Setting of the scheme for the separation of MSW at source/ Construction and installation of the prototype composting unit

Action 3 includes the setting of the scheme for the separation of MSW at source and the construction and installation of the prototype composting unit in the preselected location in Tinos Island. Action 3 has started on 01.04.2012 and will end on 30.06.2014.

The main objectives of Action 3 are:

  • Order and purchase special bags, baskets and bins for the sorting of recyclables and biowaste
  • Setting of the bins to central points of the island
  • Construction and installation of the prototype aerobic composting system for the treatment of biowaste in the demonstration area in Tinos Island

Action 3 will be implemented through three (3) activities.